Larry Williams Drive
Perspective with Heather du Plessis-Allan: Wellingtonians should be angry about this
- Autor: Vários
- Narrador: Vários
- Editora: Podcast
- Duração: 0:02:18
- Mais informações
Informações:
Sinopse
Here’s a question for you: Was your first reaction to the news of sewage pumping into Wellington’s water something along the lines of, “Oh well, these things happen”? I ask because I’ve spent the past 24 hours fighting the urge to wave this away as one of those unfortunate, unforeseen things that just happen from time to time. You know — mistakes happen. I’m glad I resisted that urge, because the latest information actually makes the situation far more concerning.The Moa Point facility is run by a private contractor, Veolia, and there have been years of warnings that it was non-compliant. Since January 2024 — two years ago — it has failed to meet compliance every single month except for two. That’s a pretty poor record. The issues have included inappropriate discharges, odour problems, and repeated problems involving faecal bacteria. A review three years ago looked across all four water‑treatment plants Veolia runs in the Wellington region and found understaffing, inexperienced operators, and frontline teams